Return to site

Unit 7data Analysis And Probabilitywelcome

broken image


  • This topic has 1 reply, 2 voices, and was last updated 1 month ago by Kim Smith.
  1. Data Analysis And Probability Pdf
  2. Spectrum Data Analysis And Probability
  3. Unit 7 Data Analysis And Probabilitywelcome
  • Posts
  • Hi Sir,
    I have read through all the thread regarding this module in opentuition.

    I gt the answer correct for Q2.

    However, I am stucked with Q3, Q4 & Q5

    With regards to Q3, how much additional profit would be generated if $250,000 spent on automated ticket barrier investment?

    I am wondering since the equation is Y= constant+ (a)X1 +(b)X2+(c)X3+ (d) X4,
    I knw that the c will be $250,000, however, I have no idea what to put for a,b &d? is it put 0? I have tried, but it doesn't work. Hopefully sir can help

    I do know that additional profit= additional revenue becoz no variable cost.

    Also, need some guidance for Q4 & Q5

    Thank you sir

    Easeus data recovery full torrent. Please see my posts on this thread https://opentuition.com/topic/ethics-and-professional-skills-module-unit-7 – if you work through the illustration first you should understand how everything hangs together.

  • This topic has 1 reply, 2 voices, and was last updated 1 month ago by Kim Smith.

Unit 7 Lesson 1 251 5. Ariel wanted to find out what the Grade 6 students in her school wanted to be when they left school. She wrote this question. Ariel gave this question to the 76 students in Grade 6. Forty-five people answered the question. Here are the results. Ariel concluded that most students will become.

  • Posts
  • Hi Sir,
    I have read through all the thread regarding this module in opentuition.

    I gt the answer correct for Q2.

    However, I am stucked with Q3, Q4 & Q5

    With regards to Q3, how much additional profit would be generated if $250,000 spent on automated ticket barrier investment?

    I am wondering since the equation is Y= constant+ (a)X1 +(b)X2+(c)X3+ (d) X4,
    I knw that the c will be $250,000, however, I have no idea what to put for a,b &d? is it put 0? I have tried, but it doesn't work. Hopefully sir can help

    I do know that additional profit= additional revenue becoz no variable cost.

    Also, need some guidance for Q4 & Q5

    Thank you sir

    Please see my posts on this thread https://opentuition.com/topic/ethics-and-professional-skills-module-unit-7 – if you work through the illustration first you should understand how everything hangs together.

Data Analysis And Probability Pdf

Data

Spectrum Data Analysis And Probability

Data analysis probability and statistics

Spectrum Data Analysis And Probability

Unit 7 Data Analysis And Probabilitywelcome

  • File Type PDF Unit 3 Math Lesson 7 Data AnalysisUnit 3 Math Lesson 7 Lesson 3 - Illustrative Mathematics Grade 7, Unit 1.3 Unit 3 - Functions - eMathInstruction Math 7 Unit 3 - Alta Sierra Intermediate N-Gen Math 7.Unit 3.Lesson 8.Graphs of Proportional Relationships Unit 3: Measuring circles Khan Academy Grade 6 Mathematics, Unit 3.7 - Open.
  • Start studying Unit 7: Data Analysis and Probability. Learn vocabulary, terms, and more with flashcards, games, and other study tools.
  • Specific Outcomes: 1) Critique ways in which data are presented. 2) Solve problems involving the probability of independent events.




broken image